Agenda item

Planning Application EPF/1709/19 - Garden Centre, Crown Hill, Waltham Abbey EN9 3TF

To consider the attached report.

Minutes:

23

 

 

APPLICATION No:

EPF/1709/19

 

 

SITE ADDRESS:

Garden Centre

Crown Hill

Waltham Abbey

Essex

EN9 3TF

 

 

PARISH:

Waltham Abbey

 

 

WARD:

Waltham Abbey High Beach

 

 

 

 

DESCRIPTION OF PROPOSAL:

Demolition of existing Garden Centre buildings and the erection of x 2 no. semi-detached houses. (Revised application to EPF/2583/18).

 

 

DECISION:

GRANTED (Subject to Legal Agreement)

 

Click on the link below to view related plans and documents for this case:

http://planpub.eppingforestdc.gov.uk/NIM.websearch/ExternalEntryPoint.aspx?SEARCH_TYPE=1&DOC_CLASS_CODE=PL&FOLDER1_REF=626136

 

 

CONDITIONS

1

The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this notice.

 

2

The development hereby permitted will be completed strictly in accordance with the approved drawings numbers:

ELA/1, ELA/111, ELA/2000, ELA/409, ELA/400, ELA/666 ELA/800, PLANNING STATEMENT, INCORPORATING DESIGN & ACCESS ELEMENTS UPDATED PLANNING STATEMENT.

 

3

No construction works above ground level shall have taken place until documentary and photographic details of the types and colours of the external finishes have been submitted to and approved by the Local Planning Authority, in writing, prior to the commencement of the development. The development shall be implemented in accordance with such approved details.

 

4

Prior to preliminary ground works taking place, details of surface water disposal shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with such agreed details.

 

5

No preliminary ground works shall take place until a flood risk assessment and management and maintenance plan has been submitted to and approved by the Local Planning Authority. The assessment shall demonstrate that adjacent properties shall not be subject to increased flood risk and, dependant upon the capacity of the receiving drainage, shall include calculations of any increased storm run-off and the necessary on-site detention. The approved measures shall be carried out prior to the substantial completion of the development hereby approved and shall be adequately maintained in accordance with the approved management and maintenance plan.

 

6

No development shall commence until an assessment of the risks posed by any contamination, carried out in accordance with British Standard BS 10175: Investigation of potentially contaminated sites - Code of Practice and the Environment Agency's Model Procedures for the Management of Land Contamination (CLR 11) (or equivalent British Standard and Model Procedures if replaced), shall have been submitted to and approved in writing by the local planning authority. If any contamination is found, a report specifying the measures to be taken, including the timescale, to remediate the site to render it suitable for the approved development shall be submitted to and approved in writing by the local planning authority. The site shall be remediated in accordance with the approved measures and timescale and a verification report shall be submitted to and approved in writing by the local planning authority. If, during the course of development, any contamination is found which has not been previously identified, work shall be suspended and additional measures for its remediation shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures and a verification report for all the remediation works shall be submitted to the local planning authority within 21 days of the report being completed and approved in writing by the local planning authority.



7

Following completion of the measures identified in the approved remediation scheme, and prior to the first use or occupation of the development, a verification report that demonstrates the effectiveness of the remediation carried out must be produced together with any necessary monitoring and maintenance programme and copies of any waste transfer notes relating to exported and imported soils shall be submitted to the Local Planning Authority for approval. The approved monitoring and maintenance programme shall be implemented. 

 

 

8

In the event that any evidence of potential contamination is found at any time when carrying out the approved development that was not previously identified in the Phase 2 report, work shall be suspended and additional measures for its remediation shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures and a verification report for all the remediation works shall be submitted to the local planning authority within 21 days of the report being completed and approved in writing by the local planning authority.

 

9

Prior to first occupation of the development, a scheme to enhance the ecological value of the site shall be submitted to and agreed in writing by the Local Planning Authority. The ecological value shall be quantified using the Biodiversity Impact Assessment Calculator (BIAC) where appropriate. The scheme shall be implemented in full prior to the occupation of the development hereby approved.

 

10

No development, including works of demolition or site clearance, shall take place until a Tree Protection Plan, Arboricultural Method Statement and site monitoring schedule in accordance with BS:5837:2012 (Trees in relation to design, demolition and construction - Recommendations) has been submitted to the Local Planning Authority and approved in writing. The development shall be carried out only in accordance with the approved documents unless the Local Planning Authority gives its written consent to any variation.

11

Prior to any above ground works, full details of both hard and soft landscape works (including tree planting) and implementation programme (linked to the development schedule) shall be submitted to and approved in writing by the Local Planning Authority. These works shall be carried out as approved. The hard landscaping details shall include, as appropriate, and in addition to details of existing features to be retained: proposed finished levels or contours; means of enclosure; car parking layouts; other minor artefacts and structures, including signs and lighting and functional services above and below ground. The details of soft landscape works shall include plans for planting or establishment by any means and full written specifications and schedules of plants, including species, plant sizes and proposed numbers /densities where appropriate. If within a period of five years from the date of the planting or establishment of any tree, or shrub or plant, that tree, shrub, or plant or any replacement is removed, uprooted or destroyed or dies or becomes seriously damaged or defective another tree or shrub, or plant of the same species and size as that originally planted shall be planted at the same place, unless the Local Planning Authority gives its written consent to any variation.

 

12

Prior to the first occupation of the development the access arrangements, visibility splays, vehicle parking and turning areas as indicated on the approved plans shall be provided, hard surfaced, sealed and marked out. The access, parking and turning areas shall be retained in perpetuity for their intended purpose.

 

13

No unbound material shall be used in the surface treatment of the vehicular access within 6 metres of the highway boundary.

 

14

Any gates provided at the vehicular access shall be inward opening only and shall be set back a minimum of 6 metres from the back edge of the carriageway.

 

15

The development shall not be commenced until details of the treatment of all boundaries including drawings of any gates, fences, walls or other means of enclosure have been submitted to and approved in writing by the local planning authority. The approved boundary treatments shall be completed prior to the first occupation of the development and shall thereafter be permanently retained and maintained.

 

16

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, as amended, (or any other order revoking, further amending or re-enacting that Order) no development generally permitted by virtue of Classes A, B and E  of Part 1 of Schedule 2 to the Order, shall be undertaken without the prior written permission of the Local Planning Authority.

 

17

Prior to first occupation of the development hereby approved, 1 Electric Vehicle Charging Point for each dwelling  shall be installed and retained thereafter for use by the occupants of the site.

 

18

Prior to first occupation of the development, measures shall be incorporated within the development to ensure a water efficiency standard of 110 litres (or less) per person per day.

 

19

All construction/demolition works and ancillary operations, including vehicle movement on site which are audible at the boundary of noise sensitive premises, shall only take place between the hours of 07.30 to 18.30 Monday to Friday and 08.00 to 13.00 hours on Saturday, and at no time during Sundays and Public/Bank Holidays unless otherwise agreed in writing by the Local Planning Authority.

 

20

Wheel washing or other cleaning facilities for vehicles leaving the site during construction works shall be installed and utilised to clean vehicles immediately before leaving the site. Any mud or other material deposited on nearby roads as a result of the development shall be removed.

 

21

No development shall take place until the applicant has secured the implementation of a programme of archaeological work in accordance with a written scheme of investigation, which has been submitted by the applicant and approved in writing by the planning authority.

 

 

 

 

 

 

 

 

 



 

 

 

 

123



 

 

 