Agenda item

Planning Application - EFP/1177/19 - Garages at Lower Alderton Hall Lane, Loughton, Essex, IG10 3HA

To consider the attached report.

Minutes:

 

APPLICATION No:

EPF/1177/19

 

SITE ADDRESS:

Garages at Lower Alderton Hall Lane

Loughton

Essex

IG10 3HA

 

PARISH:

Loughton

 

WARD:

Loughton Alderton

 

 

DESCRIPTION OF PROPOSAL:

Demolish existing garages and erect x 2 no. affordable homes.

 

DECISION:

Grant Permission (Subject to Legal Agreement)

 

 

Click on the link below to view related plans and documents for this case:

http://planpub.eppingforestdc.gov.uk/NIM.websearch/ExternalEntryPoint.aspx?SEARCH_TYPE=1&DOC_CLASS_CODE=PL&FOLDER1_REF=623799

 

 

CONDITIONS

1

The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this notice.

 

2

The development hereby permitted will be completed strictly in accordance with the approved drawings numbers: 612/055/PL01, PL02, PL03A, PL04A, PL05 and PL06.

 

3

The development hereby permitted shall not be commenced until detailed design and method statements (in consultation with London Underground) for all of the foundations, basement and ground floor structures, or for any other structures below ground level, including piling (temporary and permanent), have been submitted to and approved in writing by the local planning authority which:

 

-           provide details on all structures

-           accommodate the location of the existing London Underground structures and tunnels

 

The development shall thereafter be carried out in all respects in accordance with the approved design and method statements, and all structures and works comprised within the development hereby permitted which are required by the approved design statements in order to procure the matters mentioned in paragraphs of this condition shall be completed, in their entirety, before any part of the buildings hereby permitted are occupied.

 

4

No development shall commence until an assessment of the risks posed by any contamination, carried out in accordance with British Standard BS 10175: Investigation of potentially contaminated sites - Code of Practice and the Environment Agency's Model Procedures for the Management of Land Contamination (CLR 11) (or equivalent British Standard and Model Procedures if replaced), shall have been submitted to and approved in writing by the local planning authority. If any contamination is found, a report specifying the measures to be taken, including the timescale, to remediate the site to render it suitable for the approved development shall be submitted to and approved in writing by the local planning authority. The site shall be remediated in accordance with the approved measures and timescale and a verification report shall be submitted to and approved in writing by the local planning authority. If, during the course of development, any contamination is found which has not been previously identified, work shall be suspended and additional measures for its remediation shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures and a verification report for all the remediation works shall be submitted to the local planning authority within 21 days of the report being completed and approved in writing by the local planning authority.

 

5

Following completion of the measures identified in the approved remediation scheme, and prior to the first use or occupation of the development, a verification report that demonstrates the effectiveness of the remediation carried out must be produced together with any necessary monitoring and maintenance programme and copies of any waste transfer notes relating to exported and imported soils shall be submitted to the Local Planning Authority for approval. The approved monitoring and maintenance programme shall be implemented. 

 

6

In the event that any evidence of potential contamination is found at any time when carrying out the approved development that was not previously identified in the Phase 2 report, work shall be suspended and additional measures for its remediation shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures and a verification report for all the remediation works shall be submitted to the local planning authority within 21 days of the report being completed and approved in writing by the local planning authority.

 

7

No ground works shall take place until details of levels have been submitted to and approved by the Local Planning Authority showing cross-sections and elevations of the levels of the site prior to development and the proposed levels of all ground floor slabs of buildings, roadways and accessways and landscaped areas. The development shall be carried out in accordance with those approved details.

 

8

Prior to preliminary ground works taking place, details of surface water disposal shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with such agreed details.

 

9

No development, including works of demolition or site clearance, shall take place until a Tree Protection Plan, Arboricultural Method Statement and site monitoring schedule in accordance with BS:5837:2012 (Trees in relation to design, demolition and construction - Recommendations) has been submitted to the Local Planning Authority and approved in writing. The development shall be carried out only in accordance with the approved documents unless the Local Planning Authority gives its written consent to any variation.

 

10

No construction works above ground level shall have taken place until documentary and photographic details of the types and colours of the external finishes have been submitted to and approved by the Local Planning Authority, in writing, prior to the commencement of the development. The development shall be implemented in accordance with such approved details..

 



 

11

Prior to any above ground works, full details of both hard and soft landscape works (including tree planting) and implementation programme (linked to the development schedule) shall be submitted to and approved in writing by the Local Planning Authority. These works shall be carried out as approved. The hard landscaping details shall include, as appropriate, and in addition to details of existing features to be retained: proposed finished levels or contours; means of enclosure; car parking layouts; other minor artefacts and structures, including signs and lighting and functional services above and below ground. The details of soft landscape works shall include plans for planting or establishment by any means and full written specifications and schedules of plants, including species, plant sizes and proposed numbers /densities where appropriate. If within a period of five years from the date of the planting or establishment of any tree, or shrub or plant, that tree, shrub, or plant or any replacement is removed, uprooted or destroyed or dies or becomes seriously damaged or defective another tree or shrub, or plant of the same species and size as that originally planted shall be planted at the same place, unless the Local Planning Authority gives its written consent to any variation.

 

12

If any tree, shrub or hedge shown to be retained in the submitted Arboricultural reports is removed, uprooted or destroyed, dies, or becomes severely damaged or diseased during development activities or within 3 years of the completion of the development, another tree, shrub or hedge of the same size and species shall be planted within 3 months at the same place, unless the Local Planning Authority gives its written consent to any variation. If within a period of five years from the date of planting any replacement tree, shrub or hedge is removed, uprooted or destroyed, or dies or becomes seriously damaged or defective another tree, shrub or hedge of the same species and size as that originally planted shall, within 3 months, be planted at the same place.

 

13

Prior to first occupation of the development hereby approved, Electric Vehicle Charging Points shall be installed to serve a minimum of 50% of the parking spaces within the site, and retained thereafter for use by the occupants of the site.

 

14

All construction/demolition works and ancillary operations, including vehicle movement on site which are audible at the boundary of noise sensitive premises, shall only take place between the hours of 07.30 to 18.30 Monday to Friday and 08.00 to 13.00 hours on Saturday, and at no time during Sundays and Public/Bank Holidays unless otherwise agreed in writing by the Local Planning Authority.

 

15

Wheel washing or other cleaning facilities for vehicles leaving the site during construction works shall be installed and utilised to clean vehicles immediately before leaving the site. Any mud or other material deposited on nearby roads as a result of the development shall be removed.

 

16

All material excavated from the below ground works hereby approved shall be removed from the site unless otherwise agreed in writing by the Local Planning Authority.

 

17

Prior to the first occupation of the development the access arrangements, vehicle parking and turning areas as indicated on the approved plans shall be provided, hard surfaced, sealed and marked out. The access, parking and turning areas shall be retained in perpetuity for their intended purpose.

 

18

Prior to first occupation of the proposed development, the Developer shall be responsible for the provision and implementation of a Residential Travel Information Pack for sustainable transport, approved by Essex County Council.

 

19

There shall be no discharge of surface water onto the Highway.

20

No unbound material shall be used in the surface treatment of the vehicular access within 6 metres of the highway boundary.

 

21

Prior to first occupation of the development, measures shall be incorporated within the development to ensure a water efficiency standard of 110 litres (or less) per person per day.

 

22

The window openings in the south elevation shall be entirely fitted with obscured glass with a minimum Level 3 obscurity and have fixed frames to a height of 1.7 metres above the floor of the room in which the window is installed and shall be permanently retained in that condition.

23

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, as amended, (or any other order revoking, further amending or re-enacting that Order) no development generally permitted by virtue of Classes A and E of Part 1 of Schedule 2 to the Order, shall be undertaken without the prior written permission of the Local Planning Authority.

 

 

 

And subject to the completion of an agreement under Section 106 of the Town and Country Planning Act 1990 to secure a financial and/or other contributions towards mitigation of the impact of the development on visitor pressure and air quality in the Epping Forest Special Area of Conservation.

 