Agenda item

Planning Application EPF/2473/16 – Woodview, Lambourne Road, Chigwell

To consider the attached report of the District Development Management Committee for the Planning Application EPF/2550/16 – Woodview, Lambourne Road, Chigwell which was referred to the Council on 5 April 2017.

Minutes:

Mover: Councillor B Sandler, Chairman of District Development Management Committee

 

The Assistant Director of Governance (Development Management) presented a report regarding a planning application for the demolition of the existing 22 bedroom residential dwelling, the associated 3 bedroom retirement dwelling and garages/outbuildings, and replacement with a new three storey 72 bedroom care home, and one three storey block containing 25 retirement living apartments, together with the provision of 51 car parking spaces and landscaping.

 

Report as first moved ADOPTED

 

            RESOLVED:

 

That the planning Application EPF/2473/16 – Woodview, Lambourne Road, Chigwell be granted subject to the following conditions;

 

1. The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this notice.

 

2. No construction works above ground level shall take place until documentary and photographic details of the types and colours of the external finishes have been submitted to and approved by the Local Planning Authority, in writing. The development shall be implemented in accordance with such approved details.

 

3. No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide for:

·         The parking of vehicles of site operatives and visitors

·         Loading and unloading of plant and materials

·         Storage of plant and materials used in constructing the development

·         The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate

·         Measures to control the emission of dust and dirt during construction, including wheel washing

·         A scheme for recycling/disposing of waste resulting from demolition and construction works.

 

4. No development, including works of demolition or site clearance, shall take place until a Tree Protection Plan Arboricultural Method Statement and site monitoring schedule in accordance with BS:5837:2012 (Trees in relation to design, demolition and construction - recommendations) has been submitted to the Local Planning Authority and approved in writing. The development shall be carried out only in accordance with the approved documents unless the Local Planning Authority gives its written consent to any variation.

 

5. All material excavated from the below ground works hereby approved shall be removed from the site unless otherwise agreed in writing by the Local Planning Authority.

 

6. If any tree, shrub or hedge shown to be retained in Sharon Hosegood Associates ‘Supplementary Arboricultural Report’ dated 23rd December 2016 (Ref : SHA 270 Rev A) is removed, uprooted or destroyed, or dies, or becomes severely damaged or diseased during development or within 3 years of the completion of the development, another tree, shrub or hedge of the same size and species shall be planted within 3 months at the same place, unless the Local Planning Authority gives its written consent to any variation. If within a period of five years from the date of planting any replacement tree, shrub or hedge is removed, uprooted or destroyed, or dies or becomes seriously damaged or defective another tree, shrub or hedge of the same species and size as that originally planted shall, within 3 months, be planted at the same place.

 

7.  Soft landscaping shall be implemented as shown on Tim Moya Associates, ‘Tree and Hedgerow planting plan’, Drawing number 160836-L-01 rev b, dated December 2016; and ; Tim Moya Associates, ‘soft landscaping - shrub, herbaceous, grass and bulb planting plan’, drawing number 160836-L-02 Rev a, dated December 2016 ; unless the Local Planning Authority gives its prior written approval to any alterations.

 

8. No works shall take place until a detailed surface water drainage scheme for the site, based on sustainable drainage principles and an assessment of the hydrological and hydro geological context of the development, has been submitted to and approved in writing by the local planning authority. The scheme shall subsequently be implemented prior to occupation and should include but not be limited to:

 

i) Limiting discharge rates to 2l/s for all storm events up to an including the 1 in 100 year rate plus 40% allowance for climate change.

 

ii) Provide sufficient storage to ensure no off site flooding as a result of the development during all storm events up to and including the 1 in 100 year plus 40% climate change event.

 

iii) Sufficient storage should be provided to ensure that in the event of pump failure no flooding will occur during a 1 in 30 year event.

 

iv) Provide sufficient treatment for all elements of the development. Treatment should be demonstrated to be in line with the guidance within the CIRIA SuDS Manual C753.

 

9. No works shall take place until a scheme to minimise the risk of offsite flooding caused by surface water run-off and groundwater during construction works has been submitted to, and approved in writing by, the local planning authority. The scheme shall subsequently be implemented. The scheme shall be implemented as approved.

 

10. No works shall take place until a Maintenance Plan detailing the maintenance arrangements including who is responsible for different elements of the surface water drainage system and the maintenance activities/frequencies, has been submitted to and agreed, in writing, by the Local Planning Authority. Should any part be maintainable by a Maintenance Company, details of long term funding arrangements should be provided.

 

11. The applicant or any successor in title must maintain yearly logs of maintenance which should be carried out in accordance with any approved Maintenance Plan. These must be available for inspection upon a request by the Local Planning Authority.

 

12. An internal/external bat survey of the main house and trees (if affected) shall be undertaken to include emergence re-entry surveys for bats if necessary. These surveys should be submitted to EFDC. Should the surveys reveal presence of bats, then a detailed mitigation strategy must be written in accordance with any guidelines available from Natural England (or other relevant body) and submitted to EFDC. In some cases a European Protected Species Licence may be required from Natural England. All works shall then proceed in accordance with the approved strategy with any amendments agreed in writing.

 

13. The ponds within 250m of the application site be subjected to a Habitat Suitability Index survey and the results submitted to EFDC for approval. Should the HSI survey reveal the suitability of the ponds for Great crested newts then a full survey needs to be carried out. These surveys should also be submitted to EFDC. If these surveys reveal the presence of GCNs then a detailed mitigation strategy must be written in accordance with any guidelines available from Natural England (or other relevant body) and submitted to EFDC. In some cases a European Protected Species Licence may be required from Natural England. All works shall then proceed in accordance with the approved strategy with any amendments agreed in writing.

 

14. A method statement be written and submitted for pre- and during the construction for issues concerning hedgehogs, birds, reptiles, invertebrates and invasive species. Details in the Phase 1 habitat survey by CGO Ecology Ltd submitted May 2016.)

 

15. The development be carried out in accordance with the flood risk assessment (RPS - Flood Risk Assessment including SuDS Strategy, Ref HLEF47138/001R, October 2016) and drainage strategy submitted with the application unless otherwise agreed in writing with the Local Planning Authority.

 

16. No conversion/demolition or preliminary groundwork's of any kind shall take place until the applicant has secured the implementation of a programme of archaeological work in accordance with a written scheme of investigation which has been submitted by the applicant and approved by the local planning authority.

 

17. Prior to the first occupation of the development the vehicle parking and turning areas as indicated on the approved plans shall be provided, hard surfaced, sealed and marked out. The parking and turning areas shall be retained in perpetuity for their intended purpose.

 

18. There shall be no discharge of surface water onto the Highway.

 

19. The proposed use of this site has been identified as being particularly vulnerable if land contamination is present, despite no specific former potentially contaminating uses having been identified for this site. Should any discoloured or odorous soils be encountered during development works or should any hazardous materials or significant quantities of non-soil forming materials be found, then all development works should be stopped, the Local Planning Authority contacted and a scheme to investigate the risks and / or the adoption of any required remedial measures be submitted to, agreed and approved in writing by the Local Planning Authority prior to the recommencement of development works. Following the completion of development works and prior to the first occupation of the site, sufficient information must be submitted to demonstrate that any required remedial measures were satisfactorily implemented or confirmation provided that no unexpected contamination was encountered.

 

20. The development hereby permitted will be completed strictly in accordance with the approved drawings numbered H.16.01 (9-) 5; (9-) 4 Rev B; (9-) 2 Rev F; (21) 6; (21) 5; (00) 13; (00) 7; (00) 15; (00) 14; (00) 5; (00) 6; (00) 4; (00) 12; (21) 2; 21(10.)

 

21. Prior to the undertaking of any demolition or preliminary groundworks, details of a programme of historic building recording in accordance with a written scheme of investigation shall be submitted to the local planning authority for approval in writing.  The development shall approve in accordance with the agreed details. 

 

22. The 25 elderly retirement living apartments hereby approved shall only be occupied by residents who are 60 or more years old, except where the partner of a resident is 55 or more years old.  

 

23.       That planning permission be issued after the completion of a legal agreement (Section 106 of the Town and Country Planning Act 1990) that ensures a satisfactory financial contribution in respect of:-

 

(a) £443,885 for off-site Affordable Housing; and

(b) £55,720 for provision of local early years childcare places.

Supporting documents: